Stage 1 Storm Sewer Improvements – City of Shelbyville, Illinois
Overview:
The project included construction of approximately 0.29 miles of storm sewer along Morgan Street from IL 16 to South Washington Street, with an additional 750-foot extension south along South Washington Street. TWG provided construction engineering oversight to ensure successful execution in accordance with project plans and specifications.
What TWG Delivered:
– Construction Observation: Monitored contractor operations for compliance with approved plans and specifications.
– Construction Layout: Established and set field lines and grades throughout construction.
– Material Testing & Inspection: Coordinated sampling and testing of all required construction materials.
– Documentation & Reporting: Maintained daily reports, records of contractor activities, and documentation for change orders and extra work.
– Payment Administration: Prepared and submitted partial and final payment estimates.
– As-Built Documentation: Developed final as-built drawings reflecting completed construction conditions.
Results:
TWG Engineering provided comprehensive construction engineering oversight that supported the successful installation of new storm sewer infrastructure and ensured quality, compliance, and accurate project documentation. The project was completed in 2021.