6th Street (I-55 BUS) Resurfacing – IDOT District 6
Overview:
The project included resurfacing and infrastructure improvements along 6th Street from just north of Myrtle Street to Stanford Avenue. Work included pavement milling and overlay, drainage upgrades, ADA improvements, and traffic signal modernization in accordance with IDOT requirements for federally funded roadway projects.
What We Delivered:
– Phase I & Phase II Engineering: Provided design and documentation for a federally funded resurfacing project in accordance with IDOT standards.
– Pavement & Drainage Improvements: Designed pavement milling and overlay, storm sewer upgrades, curb and gutter replacement, and driveway reconstruction.
– ADA & Pedestrian Upgrades: Reconstructed sidewalks and ramps to meet current ADA accessibility requirements.
– Traffic Signal Modernization: Designed new signal foundations, poles, cabinets, interconnects, and temporary signals to maintain traffic during construction.
– Utility Coordination & Traffic Control: Coordinated with existing utilities and prepared maintenance of traffic plans to support safe construction operations.
Results:
TWG delivered engineering services for this $3.4 million federally funded resurfacing project, improving pavement condition, drainage, accessibility, and signal performance while meeting all IDOT design and ADA requirements. The project was completed in 2023.